Our Capabilities

This way you can see for yourself all that we have to offer. 

Fabrication of Various Acid Plant 1 Gas Ducts Replacement Total: 70 Metric Tons

2020 Fabrication Project

Design, Build, and Fabricate

A comprehensive engineering project involving the design, construction, and fabrication of the UC Towing Tank Facility. The scope included civil works, mechanical systems, instrumentation, and control solutions to ensure reliable performance and operational efficiency.

 
 
 
 

2020 Fabrication Projects

Dome and Rainwater Structure

Conceptual Design

An architectural visualization showcasing the planned dome and rainwater structure, highlighting its innovative design and overall project concept.

3D Project Rendering

A detailed 3D model illustrating the completed design, providing a realistic preview of the structure's appearance and functionality.

Structural Fabrication

Steel framework fabrication and assembly in progress, demonstrating precision engineering and quality workmanship during construction.

Pipes Shoes Projects of Leyte, Negros, Kidapawan and Sorsogon Sites

2021 Fabrication Project

FABRICATION & ON-SITE INSTALLATION NEW DT1 PUMP TANK

8.8 Meters Diameter Tank
Material:
SUS316L Top Plate and
Components
A36 Plates for Bottom
Dish and Shell Plates

FABRICATION OF 9 UNITS SUS316L EXPANSION BELLOWS

Forming and Fabrication

Precision forming and fabrication of SUS316L expansion bellows, ensuring accurate dimensions, high corrosion resistance.

Assembly and Welding

Assembly and welding of stainless steel expansion bellows using high-quality fabrication techniques to achieve structural integrity, leak-tight performance, and long-term durability.

Finished Product

Completed fabrication of nine (9) SUS316L expansion bellows, thoroughly inspected and prepared for installation in Industrial piping system.

2023 Fabrication Projects

FABRICATION OF 23M PIPE BRIDGE

Engineering Design

Detailed structural modeling and design of the 23-meter pipe bridge to ensure strength, stability, and compliance with project specifications.

Fabrication

Precision fabrication of the 23-meter pipe bridge using high-quality steel components and industry-standard welding techniques for long-lasting performance.

Finished Product

On-site fabrication and finishing of the 23-meter pipe bridge, with skilled personnel performing welding, inspection, and surface preparation.